Bolton 122's Restoration
15th March 2004
<-- Index | Showing 1-60 of 207 pictures | Next -->
Nostalgia, thats what it's all about. This bus was a part of my early life in Bolton, Lancashire and I was taken into town on it and its brothers many times by my mother in the early-mid 60's.
I remember gleefully kneeling up on the front long seat behind the driver, watching all that he did while he was driving. The only interesting thing about school were the old buses that took us there and back and 122 was one of many that came and went.
It disappeared to what I thought was a scrapyard in the early 70's and that was that I thought.......!
In 1999 someone in the bus restoration world said it had been restored in the early 80's but was now down at heel, languishing at a bus depot in Wigan just a few weeks away from being chucked out for the local kids to destroy. I had to have it. So here we go; little did I know how bad the condition was....
This collection will hopefully illustrate what goes into restoring a vintage bus on a tight budget.
The fact I obtained it at no cost was a good start!
The restoration of Bolton 122 is funded by a little business called Boltons Bits selling 4mm scale model bus components and transfers.
PLEASE NOTE.....THE PICTURES ARE NUMBERED IN HISTORICAL ORDER FROM 122#2 ONWARDS.
The early pics will be scanned photos but digtal ones will appear later on.
Tank bracket removed for de-rusting and painting.
Tank bracket removed for de-rusting and painting.
800x600
P1020728.JPG
Tank bracket removed for de-rusting and painting.
Tank bracket removed for de-rusting and painting.
800x600
P1020727.JPG
Chassis space where auxiliary air tank fits, ready for cleaning and painting.
Chassis space where auxiliary air tank fits, ready for cleaning and painting.
800x600
P1020726.JPG
Chassis space where auxiliary air tank fits, ready for cleaning and painting.
Chassis space where auxiliary air tank fits, ready for cleaning and painting.
800x600
P1020725.JPG
Chassis space where auxiliary air tank fits, ready for cleaning and painting.
Chassis space where auxiliary air tank fits, ready for cleaning and painting.
800x600
P1020724.JPG
Air tank re-fitted and auxiliary tank removed for derusting and painting.
Air tank re-fitted and auxiliary tank removed for derusting and painting.
800x600
P1020723.JPG
Space on Chassis where main air tank fits. All cleaned up and painted, ready to receive the repainted air tank. Many thanks Geoff!
Space on Chassis where main air tank fits. All cleaned up and painted, ready to receive the repainted air tank. Many thanks Geoff!
800x600
P1020722.JPG
Pedals, floor leathers steering wheel and cab seat fitted. (Steering wheel needs a clean!)
Pedals, floor leathers steering wheel and cab seat fitted. (Steering wheel needs a clean!)
1024x768
P1020121.JPG
Cab floor sections now all fitted. Pedals and leather bits next.
Cab floor sections now all fitted. Pedals and leather bits next.
1024x768
122_200.jpg
Cab floor sections now all fitted. Pedals and leather bits next.
Cab floor sections now all fitted. Pedals and leather bits next.
1024x768
122_199.jpg
Yes it still exists!! Rare view of 122, exposed during an extensive depot shuntabout.
Yes it still exists!! Rare view of 122, exposed during an extensive depot shuntabout.
1024x768
122_198.jpg
Bit more floor!
Bit more floor!
1024x768
122_197.jpg
New bottom hose fitted to radiator. Pig of a job.
New bottom hose fitted to radiator. Pig of a job.
1024x768
122_196.jpg
New Section of aluminium floor fabricated and fitted.
New Section of aluminium floor fabricated and fitted.
1024x768
122_195.jpg
New Section of aluminium floor being fabricated.
New Section of aluminium floor being fabricated.
1024x768
122_194.jpg
New Section of aluminium floor being fabricated.
New Section of aluminium floor being fabricated.
1024x768
122_194.jpg
Ex Leyland Tiger cub voltage regulator fitted to replace lost original equipment. AND IT WORKS!
Ex Leyland Tiger cub voltage regulator fitted to replace lost original equipment. AND IT WORKS!
2048x1536
122_193.jpg
Ex Leyland Tiger cub voltage regulator fitted to replace lost original equipment. AND IT WORKS!
Ex Leyland Tiger cub voltage regulator fitted to replace lost original equipment. AND IT WORKS!
1536x2048
122_192.jpg
Ex Leyland Tiger cub voltage regulator fitted to replace lost original equipment. AND IT WORKS!
Ex Leyland Tiger cub voltage regulator fitted to replace lost original equipment. AND IT WORKS!
1536x2048
122_191.jpg
Ex Leyland Tiger cub voltage regulator fitted to replace lost original equipment. AND IT WORKS!
Ex Leyland Tiger cub voltage regulator fitted to replace lost original equipment. AND IT WORKS!
2048x1536
122_190.jpg
As the experiment with the alternator didn't work, the original dynamo was unearthed, serviced, tested and re-fitted. Sadly all the original voltage regulator gear had crumbled away so this is the regulator off a Tiger Cub! Works well after Graham sorted a dodgy contact for me!
As the experiment with the alternator didn't work, the original dynamo was unearthed, serviced, tested and re-fitted. Sadly all the original voltage regulator gear had crumbled away so this is the regulator off a Tiger Cub! Works well after Graham sorted a dodgy contact for me!
2048x1536
122_189.jpg
Last window fitted.
Last window fitted.
800x600
122_188.jpg
Repaired cab door with all glass fitted.
Repaired cab door with all glass fitted.
600x800
122_187.jpg
Repaired cab door with all glass fitted and primered.
Repaired cab door with all glass fitted and primered.
600x800
122_186.jpg
Repairs to Cab door so far. Window surround straightened, new sheet aluminium on top half of door.
Repairs to Cab door so far. Window surround straightened, new sheet aluminium on top half of door.
1024x768
122_185.jpg
Repairs to Cab door so far. Window surround straightened, new sheet aluminium on top half of door.
Repairs to Cab door so far. Window surround straightened, new sheet aluminium on top half of door.
768x1024
122_184.jpg
Repairs to Cab door so far. Window surround straightened, new sheet aluminium on top half of door.
Repairs to Cab door so far. Window surround straightened, new sheet aluminium on top half of door.
768x1024
122_183.JPG.jpg
Repairs to Cab door so far. Window surround straightened, new sheet aluminium on top half of door.
Repairs to Cab door so far. Window surround straightened, new sheet aluminium on top half of door.
768x1024
122_182.jpg
Repairs to Cab door so far. Window surround straightened, new sheet aluminium on top half of door.
Repairs to Cab door so far. Window surround straightened, new sheet aluminium on top half of door.
1024x768
122_181.JPG.jpg
Repairs to Cab door so far. Window surround straightened, new sheet aluminium on top half of door.
Repairs to Cab door so far. Window surround straightened, new sheet aluminium on top half of door.
1024x768
122_180.JPG.jpg
Work has now re-started on the cab area. Mudguard cleaned up and primed ready for filling and smoothing. New woodwork also primered.
Work has now re-started on the cab area. Mudguard cleaned up and primed ready for filling and smoothing. New woodwork also primered.
800x600
122_179.JPG.jpg
Work has now re-started on the cab area. Mudguard cleaned up and primed ready for filling and smoothing. New woodwork also primered.
Work has now re-started on the cab area. Mudguard cleaned up and primed ready for filling and smoothing. New woodwork also primered.
600x800
122_178.JPG.jpg
Work has now re-started on the cab area. New woodwork around cab entrance and wheel arch.
Work has now re-started on the cab area. New woodwork around cab entrance and wheel arch.
600x800
122_177.JPG.jpg
Work has now re-started on the cab area. New woodwork around cab entrance and wheel arch.
Work has now re-started on the cab area. New woodwork around cab entrance and wheel arch.
600x800
122_176.JPG.jpg
Work has now re-started on the cab area. New woodwork around cab entrance and wheel arch.
Work has now re-started on the cab area. New woodwork around cab entrance and wheel arch.
600x800
122_175.JPG.jpg
Work has now re-started on the cab area. New woodwork around cab entrance and wheel arch.
Work has now re-started on the cab area. New woodwork around cab entrance and wheel arch.
600x800
122_174.JPG.jpg
The finished lower deck ceiling (at last!)
The finished lower deck ceiling (at last!)
1024x768
122_173.JPG.jpg
The finished lower deck ceiling (at last!) Just the lights and bell pushes to fit now.
The finished lower deck ceiling (at last!) Just the lights and bell pushes to fit now.
1024x768
122_172.JPG.jpg
The finished lower deck ceiling (at last!) Just the lights and bell pushes to fit now.
The finished lower deck ceiling (at last!) Just the lights and bell pushes to fit now.
1024x768
122_171.JPG.jpg
First bits of new ali interior trim over the offside windows, ready for the plastic strip to be installed.
First bits of new ali interior trim over the offside windows, ready for the plastic strip to be installed.
1024x768
122_170.JPG.jpg
First bits of new ali interior trim over the offside windows, ready for the plastic strip to be installed.
First bits of new ali interior trim over the offside windows, ready for the plastic strip to be installed.
1024x768
122_169.JPG.jpg
Almost completed beading between the decks and front valance in position
Almost completed beading between the decks and front valance in position
1024x768
122_168.JPG.jpg
Almost completed beading between the decks and front valance in position
Almost completed beading between the decks and front valance in position
1024x768
122_167.JPG.jpg
Almost completed beading between the decks
Almost completed beading between the decks
1024x768
122_166.JPG.jpg
More beading between the decks
More beading between the decks
1024x768
122_165.JPG.jpg
New small panel sections by front window.
New small panel sections by front window.
1024x768
122_164.JPG.jpg
New small panel sections by front window.
New small panel sections by front window.
1024x768
122_163.JPG.jpg
Drilling beading for new panels over windows.
Drilling beading for new panels over windows.
2048x1536
122_162.jpg
Drilling beading for new panels over windows
Drilling beading for new panels over windows
2048x1536
122_161.jpg
New panel sections going in over N/S lower deck windows
New panel sections going in over N/S lower deck windows
2048x1536
122_160.jpg
Downstairs ceiling panels all glossed an waiting for the beading and trims. May 07. New lower bulkhead panels also fitted
Downstairs ceiling panels all glossed an waiting for the beading and trims. May 07. New lower bulkhead panels also fitted
1024x768
122_159.jpg
Downstairs ceiling panels all glossed an waiting for the beading and trims. May 07
Downstairs ceiling panels all glossed an waiting for the beading and trims. May 07
1024x768
122_158.jpg
Downstairs ceiling panels being painted. March 07
Downstairs ceiling panels being painted. March 07
1024x768
122_157.jpg
Downstairs ceiling panels with cove panels glossed. May 07
Downstairs ceiling panels with cove panels glossed. May 07
1024x768
122_156.jpg
Downstairs ceiling panels back in. May 07
Downstairs ceiling panels back in. May 07
2048x1536
122_155.jpg
Downstairs ceiling panels back in. May 07
Downstairs ceiling panels back in. May 07
1024x768
122_154.jpg
Downstairs ceiling panels back in. May07
Downstairs ceiling panels back in. May07
1024x768
122_153.JPG
Downstairs ceiling panels back in. May 07
Downstairs ceiling panels back in. May 07
1024x768
122_152.jpg
Downstairs ceiling panels going back in. March 07
Downstairs ceiling panels going back in. March 07
1024x768
122_151.JPG
Downstairs ceiling panels going back in. March 07
Downstairs ceiling panels going back in. March 07
1024x768
122_150.JPG