Last window fitted. 800x600 122_188.jpg |
Repaired cab door with all glass fitted. 600x800 122_187.jpg |
Repaired cab door with all glass fitted and primered. 600x800 122_186.jpg |
Repairs to Cab door so far. Window surround straightened, new sheet aluminium on top half of door. 1024x768 122_185.jpg |
Repairs to Cab door so far. Window surround straightened, new sheet aluminium on top half of door. 768x1024 122_184.jpg |
Repairs to Cab door so far. Window surround straightened, new sheet aluminium on top half of door. 768x1024 122_183.JPG.jpg |
Repairs to Cab door so far. Window surround straightened, new sheet aluminium on top half of door. 768x1024 122_182.jpg |
Repairs to Cab door so far. Window surround straightened, new sheet aluminium on top half of door. 1024x768 122_181.JPG.jpg |
Repairs to Cab door so far. Window surround straightened, new sheet aluminium on top half of door. 1024x768 122_180.JPG.jpg |
Work has now re-started on the cab area. Mudguard cleaned up and primed ready for filling and smoothing. New woodwork also primered. 800x600 122_179.JPG.jpg |
Work has now re-started on the cab area. Mudguard cleaned up and primed ready for filling and smoothing. New woodwork also primered. 600x800 122_178.JPG.jpg |
Work has now re-started on the cab area. New woodwork around cab entrance and wheel arch. 600x800 122_177.JPG.jpg |
Work has now re-started on the cab area. New woodwork around cab entrance and wheel arch. 600x800 122_176.JPG.jpg |
Work has now re-started on the cab area. New woodwork around cab entrance and wheel arch. 600x800 122_175.JPG.jpg |
Work has now re-started on the cab area. New woodwork around cab entrance and wheel arch. 600x800 122_174.JPG.jpg |
The finished lower deck ceiling (at last!) 1024x768 122_173.JPG.jpg |
The finished lower deck ceiling (at last!) Just the lights and bell pushes to fit now. 1024x768 122_172.JPG.jpg |
The finished lower deck ceiling (at last!) Just the lights and bell pushes to fit now. 1024x768 122_171.JPG.jpg |
First bits of new ali interior trim over the offside windows, ready for the plastic strip to be installed. 1024x768 122_170.JPG.jpg |
First bits of new ali interior trim over the offside windows, ready for the plastic strip to be installed. 1024x768 122_169.JPG.jpg |
Almost completed beading between the decks and front valance in position 1024x768 122_168.JPG.jpg |
Almost completed beading between the decks and front valance in position 1024x768 122_167.JPG.jpg |
Almost completed beading between the decks 1024x768 122_166.JPG.jpg |
More beading between the decks 1024x768 122_165.JPG.jpg |
New small panel sections by front window. 1024x768 122_164.JPG.jpg |
New small panel sections by front window. 1024x768 122_163.JPG.jpg |
Drilling beading for new panels over windows. 2048x1536 122_162.jpg |
Drilling beading for new panels over windows 2048x1536 122_161.jpg |
New panel sections going in over N/S lower deck windows 2048x1536 122_160.jpg |
Downstairs ceiling panels all glossed an waiting for the beading and trims. May 07. New lower bulkhead panels also fitted 1024x768 122_159.jpg |
Downstairs ceiling panels all glossed an waiting for the beading and trims. May 07 1024x768 122_158.jpg |
Downstairs ceiling panels being painted. March 07 1024x768 122_157.jpg |
Downstairs ceiling panels with cove panels glossed. May 07 1024x768 122_156.jpg |
Downstairs ceiling panels back in. May 07 2048x1536 122_155.jpg |
Downstairs ceiling panels back in. May 07 1024x768 122_154.jpg |
Downstairs ceiling panels back in. May07 1024x768 122_153.JPG |
Downstairs ceiling panels back in. May 07 1024x768 122_152.jpg |
Downstairs ceiling panels going back in. March 07 1024x768 122_151.JPG |
Downstairs ceiling panels going back in. March 07 1024x768 122_150.JPG |
Downstairs ceiling panels going back in. March 07 1024x768 122_149.JPG |
Rotten planks replaced 800x533 122_148.jpg |
Rotten planks out 800x533 122_147.jpg |
Trial fitting of oil box 800x533 122_146.jpg |
Both front vents repaired and re-fitted. 640x427 122_145.JPG |
Front vent ready for new rubber seal. 640x427 122_144.JPG |
Me prepping the front window vents for re-painting and new rubbers. 640x427 122_143.JPG |
First upperdeck windows going in 640x427 122_142.JPG |
Upper deck windows stripped out, repainted ready for new rubbers and windows back in. 640x427 122_141.JPG |
Upper deck windows stripped out, repainted ready for new rubbers and windows back in. 640x427 122_140.jpg |
U/D cleared of bits & pieces for further work 1075x717 122_139.JPG |
L/D windows dismantled, repainted,new rubbers and back in place 1229x819 122_138.JPG |
L/D windows dismantled, chemically stripped and etch primed 1024x768 122_137.JPG |
L/D windows dismantled, chemically stripped and tried back in place 1024x768 122_136.JPG |
wood fillers being fitted 691x922 122_135.jpg |
wood fillers being fitted 819x614 122_134.jpg |
wood fillers being fitted 691x922 122_133.jpg |
Upstairs lights rewired and on test 819x614 122_131.jpg |
Progress in cab 819x614 122_130.jpg |
N/S seatbox repaired 691x922 122_129.jpg |
front bulkhead repairs 819x614 122_128.jpg |
| | | |